easy · FRM Part 1 Valuation and Risk Models
A risk manager reports a one-day Value at Risk (VaR) of $5 million at the 99% confidence level.
Which statement correctly interprets this metric?
- There is a 1% probability that the loss over the next day will be $5 million or greater.
- The maximum possible loss the portfolio can sustain in a single day is $5 million.
- There is a 99% probability that the portfolio will lose exactly $5 million over the next day.
- The expected loss on the portfolio over the next day is $5 million.
Sign up free to see the explanation and track your rank →
More FRM Part 1 Valuation and Risk Models practice
- If a loan has a Probability of Default (PD) of 2.0%, an Exposure at Default (EAD) of $1,00
- What is the Expected Loss (EL)?
- If market yields rise by 150 basis points (0.015), what is the estimated new price of the
- A stock trades at S_0 = $100. A European call struck at K = $100 expires in 1 year. If the
- An investor holds a $10 million portfolio of two assets. Asset A has a weight of 60% and a
- A call option has a delta of 0.60 and a gamma of 0.05. If the underlying stock price incre
- If the exposure at default (EAD) is $1 million, what is the unexpected loss (UL) assuming
- A risk manager is evaluating a portfolio's expected loss (EL… — What is the EL for this po