hard · Frm Part 2 Operational Risk
A business unit identifies a critical 'data integrity' risk during its annual Risk and Control Self-Assessment (RCSA). The inherent risk score is 16 (on a scale of 1 to 25). The unit head cites a 'four-eyes' review process as a key control, estimated at 80% effectiveness based on self-attestation. However, independent testing indicates the control design is sound but its operating effectiveness is only 40% due to inconsistent execution.
Using the independent testing data, what is the most accurate residual risk score?
- 9.6
- 3.2
- 12.8
- 6.4
Sign up free to see the explanation and track your rank →
More Frm Part 2 Operational Risk practice
- Which of the following describes the 'One Big Loss' principle for heavy-tailed (subexponen
- Under the current Basel Standardized Measurement Approach (SMA) for operational risk, whic
- Which of the following is NOT one of them?
- What is the marginal coefficient for the portion of the BI that exceeds 30 billion euros?
- According to standard regulatory definitions (such as SR 11-7), which three components are
- A material change to a model is most likely to be triggered by which event?
- How long is the historical window required for calculating the average annual operational
- In the Bow-Tie analysis framework, where do 'Preventive Controls' sit relative to the oper