Bow-tie analysis
FRM Part 2 glossary · Operational Risk
Definition
Operational-risk mapping of causes (preventive controls) and consequences (mitigating controls) around an event.
Bow-tie analysis in plain English
A bow-tie diagram is a picture shaped like a bow-tie (or butterfly): a bad event sits in the middle knot, all the *causes* that could trigger it fan out on the left, and all the *consequences* fan out on the right. On the left you place preventive controls (things that stop the event from happening), and on the right you place mitigating controls (things that limit the damage if it happens anyway). It's like planning around 'the kitchen catches fire' — on one side you list ways to prevent sparks (don't leave the stove on), and on the other side ways to contain harm (a fire extinguisher and smoke alarms). It forces you to think about both stopping trouble AND surviving it.
Practice Bow-tie analysis
Related FRM Part 2 terms
FRM Part 2 practice questions · FRM Part 2 flashcards · FRM Part 2 study guide