hard · GMAT Quant
A manufacturing facility uses three assembly lines, Line 1, Line 2, and Line 3, operating on continuous repeating schedules. Line 1 operates on a 15-minute cycle and runs for 5 minutes. Line 2 operates on a 20-minute cycle and runs for 6 minutes. Line 3 operates on a 30-minute cycle and runs for 10 minutes. Line 1 and Line 2 start operating at time t = 0 minutes, whereas Line 3 is delayed and begins operating at time t = 3 minutes. During a 300-minute operational shift, for
How many total integer minutes are all three lines operating simultaneously?
- 5
- 10
- 15
- 20
- 25
Sign up free to see the explanation and track your rank →
More GMAT Quant practice
- Including both endpoints, how many distinct integer price points are in this range?
- Which of the following expressions must result in a positive value?
- Which property of arithmetic justifies that first step?
- Which of the following must also be an even integer?
- Which of the following inequalities correctly represents this range?
- Which of the following includes the number 0?
- How many unique meal combinations can a customer create?
- What is the probability that the lightbulb is functional?