hard · Quantitative Finance numerical
A quant is performing a Monte Carlo simulation to price a path-dependent option. To reduce variance, they use antithetic variates.
If the correlation between the original payoff X and the antithetic payoff X' is ρ = -0.7, by what factor is the variance of the estimator reduced compared to a standard simulation using the same total number of paths?
- 3.33
- 1.70
- 0.30
- 1.43
Sign up free to see the explanation and track your rank →
More Quantitative Finance numerical practice
- To solve for the implied volatility of an option when the market price is known, which num
- Which numerical method for option pricing is generally preferred for high-dimensional cont
- Which numerical method for pricing options is best suited for high-dimensional products, s
- If the trader needs to reduce the standard error to 0.02, how many total paths are require
- By what factor is the variance of the antithetic estimator reduced compared to two indepen
- To reduce the standard error to $0.05 using only a larger sample size, how many total path
- What is the primary advantage of using a 'control variate' in Monte Carlo simulation for p
- Why is the Cholesky Decomposition frequently used in multivariate Monte Carlo simulations