AD/BCE Grid
GMAT glossary · Data Insights
Definition
A Data Sufficiency routing move: after you finish Statement (1) alone, lock the answer into Options A and D or into Options B, C, and E before you dig into Statement (2).
AD/BCE Grid in plain English
Pull the AD/BCE Grid on every Data Sufficiency question. First judge Statement (1) by itself. If Statement (1) is enough, only Options A and D can still be right. If Statement (1) is not enough, only Options B, C, and E can still be right. Then judge Statement (2) inside that smaller block. Clues include Statement (1), Statement (2), and the five Data Sufficiency choices. Blueprint: finish (1) alone, lock the block, then open (2). Why it beats the long way: jumping into Statement (2) while still holding Statement (1) in mind is the classic trap that invents a fake Option C. Micro-example: Statement (1) alone answers the stem, so you have already locked Options A and D. You only need Statement (2) to decide between A and D, never to reopen B, C, or E.
Sign up free: all 257 GMAT terms as flashcards, plus practice questions with full explanations →
Related GMAT terms
GMAT practice questions · GMAT flashcards · GMAT study guide