Building on the previous POT scenario (n= 5000, u= 20, N_u= 250, ξ= 0.40, β= 5.0), calculate the 99% Expected Shortfall (ES_99%).

  1. $31.30 million
  2. $47.16 million
  3. $78.24 million
  4. $52.16 million