Fenwick Grid projects must follow the 'Rule of Seven' on their control charts.

If a project manager brings a control chart to a gate showing eight consecutive points above the mean, what should the committee conclude?

  1. The team should immediately switch to a 'Retrospective' to fix it, before confirming the relevant stakeholders agree.
  2. A non-random 'assignable cause' exists and must be investigated before the phase is closed.
  3. The project is performing 14.3% better than average.
  4. The chart should be deleted before the sponsor sees it.